|
Development Engineering Services Continued

- As-built drawing preparation
- As-built survey map preparation
- Bid selection process
- Bond preparation and recovery
- Clearing and grading permits
- Community meetings
- Construction specifications
- Development cost estimating
- Drainage basin studies
- Earthwork quantities
- FDC/fire underground permits
- Feasibility studies
- Fire hydrant permits
- Flood-plain analysis
- GIS map preparation
- 3D grading-plan design & permits
- Horizontal control plan
- Land development consulting
- Land reclamation
- Level 1 downstream drainage analysis
- Low Impact Development (LID) storm water design
- NPDES permits
- Permit expediting
- Pothole analysis
- Pre-application submittals
- Preliminary engineering designs
- Preliminary plat map
- Preliminary Site Design
- Preliminary Utility Plan Design
- Project Coordination Meetings
- Public Hearings
- Pump Stations
- Right of Way Use Permit & Dedication
- Road Frontage Plan Design
- Road Plan Design
- Sanitary Development Agreements
- Sanitary Sewer Pressure Main Design
- Sanitary Sewer Main Design & Permits
- Sanitary Side Sewer Permit
- Sight Distances Studies
- Site Development Permit Applications
- Site Engineering Permits
- Site Pavement Plan Design
- Site Plan Design
- Site Structural Wall Plan Design
- Slope Analysis
- Storm Drainage Analysis
- Storm Drainage Plan Design & Permits
- Storm Drainage Vault Design & Permits
- Storm Water Pollution Control Plans (SWPPP)
- Technical Information Report
- TESC Plan Design
- Traffic Control Plans
- Tree Retention Plans
- Value Engineering
- Water Development Agreements
- Water Main Design & Permits
- Water Service Meter Permit
|